Distribution of outbound deliveries take more time.

$
0
0

Hi Friends,

 

In our production system there is an Issue with outbound deliveries from ECC are not distirbuted to EWM within time. It take longer time to get replicated in EWM. For just one delivery /SCWM/OUTB_DLV_SAVEREPLICA takes up to 3 minutes in peak times to distribute the Outbound delivery from ECC to EWM.

Any help on this?

 

Thanks!


EWM Document Type

$
0
0

Hi

Is it possible to trigger multiple EWM Document type out of same ECC Delivery Type (eg LF) ?

 

 

ERP Integration --> Delivery Processing --> Define ERP Document Types for Differentiation Attribute does not have much option. Do we?

 

Thanks

in RFUI transaction code while doing packing ending with error "E: Select a valid work center"

$
0
0

While doing packing with RFUI menu I ended with error message as after providing input with work center ended with error message as "E: Select a valid work center". There is no error message number any clue?

 

Sastry

unable to activate the Inbound delivery notification

$
0
0

Hi,

 

I am not able to activate Inbound Deliver notification.

 

System gives me error given below

 

Capture.PNG

 

 

Regards,

 

Pardeep Malik

How to do unpick of quantity after doing picking in delivery item

$
0
0

Hi Experts,

 

    I am in abap and I got the requirement where I need to do the unpick of the picked quantity for an delivery item and after the unpick it should get updated back in delivery.Please suggest me by technical point of view. how can I meet this requirement?Please suggest.Thanks!!

 

 

Regards

Mrinal

Door and staging area not determined automaticaly in IBD

$
0
0

Dear All ,

 

Kindly guide as Door, staging area  determination is not happening automatically after inbound delivery creation.

 

currently assignment is being carried out manually , Attached screen shots for your kind perusal.

 

door1.jpg

 

 

door2.jpg

 

Thanks

Jinoy

Delete or change outbound delivery distributed to EWM.

$
0
0

Hi gurus,

I create an outbound delivery in ERP and it is sent to EWM, EWM activates it automaticaly. Then I decide to cancel (delete) the outbound delivery. Altough the status of oubound delivery order is "not started", when i try to change it using VL02N system does not allow to change it. Posts an error message " The delivery was distributed, meaning that processing occurs in another system. The report back has not yet been received.".

What do you advice me to do.

Regards.

CIF transfer master data cannot display Chinese description

$
0
0

Hi Experts,

 

I am using CFM1 and CFM2 to transfer master data such as: material master , Customer, Vendor) from ERP(ECC 6.0 into EWM7.0.

 

In ERP, these master data has Description in Chinese, but after transfer into EWM, these Chinese characters all display in '#####'.

 

Who can advise how to transfer Chinese characters from ERP into EWM via CIF?

 

Thanks in advance.

 

Julia


in RFUI transaction code while doing packing ending with error "E: Select a valid work center"

$
0
0

While doing packing with RFUI menu I ended with error message as after providing input with work center ended with error message as "E: Select a valid work center". There is no error message number any clue?

 

Sastry

POSC outbound no automatic WT creation

$
0
0

Hi Experts,

 

I have some questions regarding the configuration of outbound POSC if anyone can kindly throw some light.

 

Outbound POSC is determined by WOCR, I have done the following but still only one WT was created:

1. Configured storage control OUT1 with step(Pick, Pack, Stage, Load)

2. Assign the storage process to WOCR for the activity areas where each process step taken place.

 

Could anyone throw some light on what logic have I be missing? I supposed the above storage process will create 3 WT?

 

I really appreciate for the help.

 

Best,

Eddie

Inbound delivery quantity is not reduced in ERP system

$
0
0

After distribution of the ERP inbound delivery to eWM system - goods receipt done with correction. Consider I am distributing quantity of 100 pcs from ERP to eWM system.

 

goods receipt correction was done for 20 pcs with process code I001.

Now the inbound delivery item quantity is updated with quantity as 80.

 

Corresponding ERP inbound delivery posting is failed. The quantity in inbound delivery line item is not updated with adjusted quantity.

 

the idoc which has triggered from eWM is carryoing the quantity of 100 pcs only.

 

Any idea how to correct the situation?

 

Regards

Sastry

Planned Duration of Warehouse task

$
0
0

Hi,

 

I have configured the planned duration parameters for Warehouse task creation under path (EWM -> Cross process settings -> WT -> Define planned duration of movements in Warehouse), in order to determine the planned completion date/time according to the source storage type from which the stock is picked, when the Warehouse task is created.

 

 

But when I released the wave, warehouse tasks are not created with the planned completion date/time as mentioned under the above path stated. Instead the planned completion date/time is determined from the departure date/time from yard mentioned in the ODO.

 

Basically I want to calculate the time taken for the Warehouse order according to the summation of planned duration time of Warehouse tasks (as defined in the above path) associated with that Warehouse Order.

 

Could you please suggest..?

 

Regards,

Shravan

Door and staging area not determined automaticaly in IBD

$
0
0

Dear All ,

 

Kindly guide as Door, staging area  determination is not happening automatically after inbound delivery creation.

 

currently assignment is being carried out manually , Attached screen shots for your kind perusal.

 

door1.jpg

 

 

door2.jpg

 

Thanks

Jinoy

HU is not proposed automatically in process step OB01

$
0
0

During creation of warehouse task for picking system is not proposing source HU.

 

Storage type is maintained with Level of Avail. Qty as Highest-Level HU,

 

Control for HU picking is maintained as Propose Source HU as Destination HU.

 

Is there any additional settings needs to be maintained?

 

Regards

Sastry

EWM POSC put away

$
0
0

Hi There,

 

I have created an Inbound Delivery in ECC and am using IDN & ID in EWM to do the complex put away. I am using IB01, IB02 & IB03 and have configured the setting for POSC using rule based for IB01 and IB02.

 

I am getting the following errors.

 

1. While configuring, I was not able to do 3065 (unloading with HU) for IB01. Instead I had used 3065 WPT

2. The IDN status is displayed in red color.

3. On creating ID, the ID number is generated, the status is again in red color (Locked).

4. WPT 1011 is being determined , but the staging area & the bin are not determined.

5. I am doing the packing in EWM, but the packed HUs are not visible when I am doing the follow up activities and creating a Ware house Task. The message is "There are no unpacked or packed warehouse request items for processing"

 

Kindly suggest what I need to do.

 

Thanks,

Vijay


In POSC - Outbound Process

$
0
0

IN POSC outbound process I have a query.

 

 

While creation of the warehouse task for the process step OB01 how the destination bin is determined?

 

Storage process : OUT1

Steps: OB01, OB02, OB03

 

 

regards,

Steve

Batch Problem in EWM(Batch Valuation does not exist)

$
0
0

Dear Experts,

 

I have a Batch Problem in EWM,

 

Step1. Transfer Material,Characteristic and Class to EWM-OK

Step2.  Create Batch for Product in EWM - OK

 

 

I can't Display this batch characteristics in EWM,

Show the message Batch Valuation does not exist.


Please check the figures as below:

Batch for Product.jpg

Untitled6.jpg

 

I can Change This Batch Characteristics in EWM,

and I key in Characteristic Value12 in EWM.


Untitled3.jpg

Untitled5.jpg

 

 

When I save this characteristic, it's still show's blank in EWM ,

But I can see the Value in ERP


The characteristics value disapper, after I click save button.

Untitled4.jpg


ERP system can show's value 12 that I Key in

Untitled7.jpg

 

 

 

I have check data integration in EWM and ERP,

 

Problem:

1. How can I display characteristics in the product for batch? How to solve the messageBatch Valuation does not exist in EWM

2. I can change characteristics value in the product for batch.After save the characteristic,it's show blank in EWM

    But I can see the characteristics value in ERP.

 

Thanks for your help!

 

 

Howard

Automatic Pack in Inbound process

$
0
0

Hi,

 

While working with pack specification I encountered with one error in inbound process.

Process scenario is as followed.

The each of product is packed into a packaging material which creates a HU(small box).

subsequently each 10 PCS of above HU's are packed into another HU(Pallet).

packaging specification is maintained with two levels.

ERP system I have created inbound delivery of 12 quantity and distributed to eWM system.

in eWM system according to packaging specification system has generated two HU's.

first top HU - 1000 contains ten low level HU's and second top HU 1001 contains two low level HU's.(worked as expected)

after confirmation of unloading task goods are available at staging area and new 2 tasks are generated.

source is staging area and destination is final bin.

Here system has created two new HU's for two tasks. ( do not know why this was happened?). Ideally the source and destination HU should be 1000 and 1001 for individual task.

when I check any one of the new HU system is taking to me HU details screen and I can see that

top HU is 1001 and low level HU's are new Handling Units.

when I tried to confirm the final putaway task system is throwing error as HU xxxxxxxxxx has a reserved quantity; HU withdrawl not possible

and from monitor when I click on HU details I have my own HU's 1000 and 1001. 1000 HU is with 10 low level HU's and 1001 is

with two low level HU's.

 

 

thanks for your time and valuable inputs..

Packing by Work Center Report - Fetch pack center data for completed WTs

$
0
0

Hi All,

 

In the pack by work center report (MON->Outbound->Process->WIP->PACKING by Work Center) I need to add a new field 'Available to Pack'. This field will have the quantity which is packed and is in Inbound packing station, ready to get packed. The standard report fetches only those records (from /SCWM/WRKL table) which are not fully picked. But I need to also display the pack centers for which the WTs are completely picked.

 

For eg: if in a wave there are 3 ODOs and totally there are 6 items, out of those 5 times should go to pack center PA10 and 1 item to PA40. If I pick all the 5 items that should go to PA10 then the report is not showing record for items in PA10, it only shows the item in PA40. The requirement is I also need to show the items for the wave in PA10 so that I can display how many are available to pack in PA10.

 

 

How to do this? Please help.

 

Thank you!

 

Best Regards,

Sriram.

problem while doing the picking

$
0
0

Hi,

 

while working with outbound process I am facing the problem.

 

Inbound process is completed with packaging specification process. each product is packed in packaging material(HU is generated).

I have created with PO with 5 quantity and subsequently inbound delivery got created for 5 pcs and distributed to eWM process.

According to packaging specification total 5 HU's are generated.

 

product is placed into one storage bin with 5 HU details.

 

When I create sales order for the product each line item quantity as 1, subsequently delivery got created with 5 line items and distributed to eWM system.

 

in eWM system there are 5 tasks are generated and system proposed for each task one Handling Unit. Subsequently I could able to complete the process of picking confirmation , packing , staging , loading the HU's into TU. completion of TU.

 

When I create a sales order with 4 quantity , a delivery has been created with 4 quantity and distributed to eWM system.

 

When I tried to create task for the ODO system has proposed only one task with 4 quantity.

 

I have the option of providing only one source HU in this stage.(in fact source HU is proposed by system only).

 

When I tried to proceed with confirmation system is proposing the error quantity is not available ( True - HU contains only one piece).

 

any clue how to overcome the situation?

 

thanks in advance for your help..